Knauf Queensferry, Queensferry Mineral Fibre Works
Permit number: EPR/BR9383ID
Operator: Knauf Insulation Ltd.
Regulated facility type: Section 3.4 Part A (1)(a) Melting mineral substances including the production of mineral fibres in plant with a melting capacity of more than 20 tonnes per day.
Regulated facility location: Chemistry Lane, Queensferry, Deeside, Flintshire, CH5 2DA.
Overview of process
The purpose of the installation is to manufacture insulation products
Related document downloads
Knauf DD for issue.pdf
PDF [376.5 KB]
New Knauf Permit 2017 final.pdf
PDF [876.1 KB]
Last updated